From model to house.
A significant part of the work no longer depends to the same degree on the weather, on the unpredictable sequence of trades, or on the variable conditions of a conventional building site.
Six stages, settled in advance.
When the design, the permits and the foundation are properly prepared, this organisation can shorten the overall schedule and, more importantly, makes it easier to follow.
You choose the model
You compare areas, layouts and architecture across the models available in the InstaHome range.
complete house modelsWe settle the configuration
Together we choose the equipment level, the options and the adaptations compatible with the building system.
Essential · Comfort · SignatureWe check the site
We analyse ground conditions, access, foundation, transport and the connections required.
before the final offerWe finalise the design
The house is configured technically and prepared for permitting and for entering production.
permitting & productionWe build under control
Structure and components are made and checked stage by stage, in an organised production environment.
verified stagesWe transport and assemble
The house is assembled on the prepared foundation, followed by final connection works and commissioning.
on the prepared foundation